Fords Bridge 
800m Lateral Move Irrigator installed 2013
Located at Fords Bridge, 130km northwest from Bourke NSW
The lateral move irrigator 2300m run length, covering 184 hectares or 454 acres
With buried guidance
Southern Cross Pump which pumps 236 litres per second
Cummins 157kw diesel engine which runs the pump & 30kw alternator
The suction screen was designed & constructed by TEAM Irrigation and has a 12 inch suction
As part of this project a brand new irrigation channel was constructed on the property.
The Lateral Move Irrigator will be used to irrigate wheat and oats
This project was undertaken in a remote area of NSW. Congratulations to Chris, Trent, Bob for their professional work on constructing this project.