30 May 2018, 02:52PM


WATCH VIDEO

Our terrific team of installers recently completed this project in Narrandera NSW for a client that operated four centre pivots and upgraded with a fifth Valley 7 span centre pivot.

After fabricating the pump platforms in Dubbo, we constructed & installed this elevated pump station adjoining the Murrumbidgee River. Flood levels were taken into consideration. The pump station pumps 5.6 mega litres per day. Fitted with a Cummins Q Series electronic engine and a 12” inclined turbine pump supplied by Dynapumps.

The pump will service a 45 hectare Valley galvanized Centre Pivot. This pivot is fitted with triple drives for added traction due to the heavy soil.

The pivot is fitted with a Nelson sprinkler system.

This client already had the AgSense control system fitted to four pivots & this new pivot was set up under the same AgSense subscription. Our client can now control pivot direction, application rates and stopping the pivots from his phone or website.

http://www.agsense.com/

If you are thinking of upgrading your irrigation system to save water & energy, then now is the time to call our office for further information.

TEAM Irrigation is part of the Ruralco Water Group, servicing NSW.

Special thanks to our TEAM - Garry, Trent, Luke, Stephen, Bob & Caleb


Tags